Awarding of urgent exterior work of existing pipe structure around the building by dismantling and replacement of pipe framework with mounting of fiber glass sheet at FICCI Museum Building from 1st to sixth floor of National Museum of Natural History.

Date 30/11/2011
Document Awarding of urgent exterior work of existing pipe structure around the building by dismantling and replacement of pipe framework
pdf 402.23 kb