Major Works
Major Works
C/o Type –II (04 Nos.), Type – III (06 nos.) Type IV (02 nos.) and Type V (02 nos.) residential quarters (D/S) including internal water supply, sanitary installation, internal E/I and development works at AZRC, Jodhpur.Providing of e-governance incorporating integrated Hi-Definition CCTV Surveillance System, IP Based Public Address & PBX System, Networking and Cabling in National Zoological Park, Mathura Road, New Delhi.Consultancy for Construction of Office Complex to accommodate Regional Office of MoEF&CC, FSI, NTCA & WCCB at Doresanipalya RF, J.P. Nagar, Bengaluru.Renovation and upkeepment of fire proof spirit building at Indian Museum Complex, ZSI at Kolkata.
S.No. | Name of Work | AA & ES Amount (In Crores) | Remarks | |||||||
---|---|---|---|---|---|---|---|---|---|---|
(A)Works completed during 2015-16 (Costing Rs. 1.00 Crore and above) | ||||||||||
1. |
Extension of Executive Hostel for IGNFA at Dehradun. SH” Civil & Electrical Works. |
11.01 |
Work executed by CCU
|
|||||||
2. |
Renovation of electrical works and A/C plants for CNH building, Kolkata |
4.90 |
Work executed by CCU
|
|||||||
3. |
Construction of Residential Quarters (6 Nos. Type-III, 2 Nos Type-IV & 2 Nos. Type-V) for BSI at Kaulagarh Road, Dehradun. |
3.66 |
Work executed by CCU
|
|||||||
4. |
C/o faunal repository of ZSI, ANRC at Port Blair, Andaman & Nicobar. |
2.96 |
Work executed by CCU
|
|||||||
5. |
Replacement of old water pipelines at staff quarters of BSI at Coimbatore. |
2.48 |
Work executed by CCU
|
|||||||
6. |
Repair / renovation of the office and auditorium (partly) and other sections of the CASFOS, Burnihat. |
1.49 |
Work executed by CCU
|
|||||||
(B)WORKS IN PROGRESS DURING 2021-22 | ||||||||||
1. |
Establishment of the Regional Museum of Natural History (RMNH) at Gangtok, Sikkim. |
57.59 |
Work executed by CCU
|
|||||||
2. |
Construction of all weather swimming pool of size 25mx21mx1.35 m (shallow end) – 1.80 (deep end) i-e allied building services of facilities for IGNFA at Dehradun. |
15.00 |
Work executed by CCU
|
|||||||
3. |
C/o Type III (10 Nos.) Type V (4 Nos.) and Type VI (01 No.) quarters at CASFOS, Burnihat (Assam). |
11.43 |
Work executed by CCU
|
|||||||
4. |
C/o National Museum and state of the art auditorium in the premises of Estuarine biology research centre at Gopalpur |
11.08 |
Work executed by CCU
|
|||||||
5. |
Construction of Ganga Knowledge Centre / Ganga Centralized aqua lab at Wildlife Institute of India, Dehradun. |
5.42 |
Work executed by CCU
|
|||||||
6. |
C/o Type –II (04 Nos.), Type – III (06 nos.) Type IV (02 nos.) and Type V (02 nos.) residential quarters (D/S) including internal water supply, sanitary installation, internal E/I and development works at AZRC, Jodhpur. |
5.20 |
Work executed by CCU |
|||||||
7 |
Providing of e-governance incorporating integrated Hi-Definition CCTV Surveillance System, IP Based Public Address & PBX System, Networking and Cabling in National Zoological Park, Mathura Road, New Delhi. |
5.20 |
Work executed by CCU |
|||||||
8. |
Renovation and upkeepment of fire proof spirit building at Indian Museum Complex, ZSI at Kolkata. |
3.71 |
Work executed by CCU |
|||||||
9. |
C/o Staff Quarters at RGRMNH at Sawai Madhopur, Rajasthan. |
2.74 |
Work executed by CCU |
|||||||
10. |
Conversion of existing store in to Visualization centre for GBPNIHESD, Almora. |
2.44 |
Work executed by CCU |
|||||||
11. |
Development work like retaining wall, connecting corridor, solar panel, barrier free access for differently abled people etc. in connection to C/o faunal repository of ZSI, at Port Blair. |
2.74 |
Work executed by CCU |
|||||||
12. |
Upgradation of office building at WRC, BSI at Pune. |
1.00 |
Work executed by CCU |
|||||||
(C) WORKS IN PLANNING DURING 2021-22 | ||||||||||
1. |
Construction of Type-II, Type-III, Type-IV, Type-V quarters, Scientist Hostel, Field Hostel, Auditorium and Administrative Block including development works for GB Pant Institute of Development (GBPINHESD) at Srinagar, Garhwal. |
44.64 |
Work executed by CCU
|
|||||||
2. |
Consultancy service to be rendered by CPWD for development of BGIR at Noida. |
5.00 |
Work executed by CCU |
|||||||
3. |
Consultancy for Construction of Office Complex to accommodate Regional Office of MoEF&CC, FSI, NTCA & WCCB at Doresanipalya RF, J.P. Nagar, Bengaluru. |
0.67 |
Work executed by CCU |
|||||||
4. |
Consultancy for C/o 30 room of executive hostel and Auditorium of capacity 250 including cafeteria and toilet for Central Arcade, State Forest Services at FRI, Campus, Dehradun |
0.24 |
Work executed by CCU |
|||||||
(A)Works completed during 2015-16 (Costing Rs. 1.00 Crore and above) | ||||||||||
1. |
Strengthening and Up-gradation of Laboratory at 4th floor in Parivesh Bhawan, CPCB, East Arjun Nagar, Delhi. SH: Civil work and Electrical installation. |
4.44 |
Work executed by CCU
|
|||||||
2. |
Construction of four class rooms for IIFM at Bhopal. |
4.24 |
Work executed by CCU
|
|||||||
3. |
Construction of Extension building for Auditorium including Electrical Installation, Fans, Power wiring and conduits for IFGTB, Coimbatore including consultancy work. |
1.60 |
Work executed by CCU
|
|||||||
4. |
Construction of Training Facility Centre and wood machinery work shop (Phase-I, Ground Floor) including electrical installation and fans for IWST, Malleswaram, Bangalore. |
1.00 |
Work executed by CCU
|
|||||||
(B) Works completed during 2016-17 (Costing Rs. 1.00 Crore and above) | ||||||||||
1. |
Renovation of Hari Singh Auditorium at IGNFA, Dehradun. |
2.13 |
Work executed by CCU |
|||||||
2. |
Construction of new building for UNESCO Category 2 Centre (C2C) on World Heritage Management and Training for the Asia Pacific Region at Wildlife Institute of India (WII) at Dehradun. |
1.49 |
Work executed by CCU |
|||||||
(C) Works completed during 2017-18 (Costing Rs. 1.00 Crore and above) | ||||||||||
1. |
C/o Fully Furnished Modern Scientist Laboratories in NRC, ZSI, Dehradun. SH: Civil and Electrical Works. |
3.10 |
Work executed by CCU |
|||||||
2. |
C/o Additional Shed for MDF facilities including electrical works for IPIRTI at Yashwantpur, Bangalore. |
2.14 |
Work executed by CCU |
|||||||
3. |
C/o Porta Cabin for NMH at BGIR, Noida. |
1.07 |
Work executed by CCU |
|||||||
(D) Works completed during 2018-19(Upto November, 2018) (Costing Rs. 1.00 Crore and above) | ||||||||||
1. |
C/o International Hostel for Women for WII at Dehradun. |
3.04 |
Work executed by CCU |
|||||||
2. |
C/o CC Platform for beat ration, garbage & Repair and renovation of footpaths, roads, etc. at NZP, New Delhi. |
1.32 |
Work executed by CCU |
|||||||
3. |
C/o Guest House for Visiting Faculty / Scientists at WII, Dehradun. SH: Civil and Electrical Works. |
1.39 |
Work executed by CCU |
|||||||
4. |
Construction of VVIP Guest House of GBPIHED at KosiKatamal, Almora. |
0.89 |
Work executed by CCU |
|||||||
(E) Works in Progress
|
||||||||||
1. |
Extension of Executive Hostel for IGNFA at Dehradun. |
11.01 |
Work being executed by CCU |
|||||||
2. |
C/o Girls Hostel for FRI (Deemed University) at FRI, Dehradun. SH: Civil & Electrical works. |
2.74 |
Work being executed by CCU |
|||||||
3. |
C/o Zonal Office for CPCB at Bhopal. |
6.59 |
Work being executed by CCU |
|||||||
4. |
Repair and rehabilitation of boundary wall at BGIR, Noida. |
1.98 |
Work being executed by CCU |
|||||||
5. |
Establishment of the Regional Museum of Natural History at Gangtok. |
57.59 |
Work being executed by CPWD |
|||||||
6. |
C/o Type-III (10 Nos.), Type V (4 Nos.) and Type VI (01 No.) quarters at Central Academy for State Forest Service, Burnihat (Assam). |
11.43 |
Work being executed by CPWD |
|||||||
7. |
Extension of Office Building for Faunal Repository at ZSI, Solan. |
1.59 |
Work being executed by CPWD |
|||||||
8. |
Construction of Faunal Repository of ZSI, ANRC, Port Blair. |
1.80 |
Work being executed by CPWD |
|||||||
9. |
Construction of Faunal Repository of ZSI, ANRC, Port Blair. |
3.94 |
Work being executed by CPWD |
|||||||
Under planning works | ||||||||||
|